MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Gun Park

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #30  
Old 25-07-06, 17:46
Hanno Spoelstra's Avatar
Hanno Spoelstra Hanno Spoelstra is offline
MLU Administrator
 
Join Date: Feb 2003
Location: The Netherlands
Posts: 14,866
Default

About the Canadian involvement in the development of the Mk.3 carriage (source: http://www.forces.gc.ca/dhh/downloads/ahq/ahq073.pdf):
Quote:
25-pr Carriage for Upper Register Firing

24. It became increasingly apparent during the Italian campaign that some modification to the 25-pr gun was desirable to enable the gun to be fired at elevations greater than those for which it was originally designed. "Upper Register" implies angles of elevation greater than 45 degrees. The method of achieving these high elevations in the field with existing equipment was to "dig in" the trail, that is to say dig a pit behind the gun so that by lowering the trail below ground level the elevation of the barrel was correspondingly raised. Obviously this digging in consumed time and delayed the deployment of guns when "upper register" was required.

25. To meet the requirement an officer of the Technical Liaison Group at C.M.H.Q. designed a hinged trail for the gun which, it was anticipated would allow an extra 15 degrees of elevation. A prototype of the design was made by No. 2 Canadian Base Workshop, England, in May 1944 (53). Trials were carried out during the summer. While these trials on the whole were satisfactory, it appeared that trouble might be expected in service due to the difficulty in excluding dirt from the hinge. Consequently, the Chief Engineer Armament Design (C.E.A.D., Ministry of Supply, U.K.) was asked to redesign this modification, incorporating improvements to exclude dirt (54). The Ordnance Board expressed the opinion that "the use of upper register firing is insufficient to justify the modification of the equipment", but considered "that this modification should be borne in mind for possible inclusion in new designs of equipment: (55).

26. The redesigned prototype (Carriage, 25-pr, Mk 3) was ready for trials in January 1945. As a result of the trials the Ordnance Board recommended the approval of the design (56), and it was adopted shortly thereafter for use on all future production of short axle 25-pr carriages (57). The finalization of the design came too late for production equipment to see service.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 08:28.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016