![]() |
#31
|
||||
|
||||
![]()
So with a bit of warmer weather and a few helping hands I got the Bofors breach mounted in the turret. As you can see there is no barrel, I will weld a dummy barrel onto the stub that screws into the breach. It will never fire but will look the part.
The front mounting pin is in the existing mounting position on the breach, the rear elevation is a work in progress. Using the left over bits that came as part of the breach I think I will be able to rig up a nice elevation mechanism. It will be complicated to build but fairly simple to operate. The cocking handle was a project in itself since the turret limits the space to make it work in, both for the size of the turret ring and the operator in it. ![]() The remains of the "loading tray" is what I plan to attach the elevation mech to, my plan is to not compromise the actual breach with any welding.
__________________
Many projects..... Complete- Ford F8 truck Complete-1956 Mk 2/3 Ferret Complete- Bofors 40mm on carriage Complete Reproduction- Vickers, Model 1937 Tank Waiting restoration- 1950 Cambridge carrier, Ford CMP Water truck, 1943 Universal carrier, 1945 Dodge APT truck, Canadian C3 Howitzer, several parts vehicles and a few ideas..... |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
T16 Project begun... | ajmac | The Carrier Forum | 4 | 22-06-10 21:31 |
Search and seizure has begun...RED ALERT | Alex Blair (RIP) | The Sergeants' Mess | 12 | 02-12-07 04:35 |