![]() |
#14
|
||||
|
||||
![]()
I do not believe the Chorehorse was fitted with the tubular frame around it. It appears as if the Cnd contract unit was fitted instead. My unit with the tubular frame fit just fine on the running board in the position I showed above in post #1.
I've got some pictures of the box that used on the Bedford FFW. I'll draw up some concept drawings as I've got a better possible idea on the whole setup.
__________________
Jordan Baker RHLI Museum, Otter LRC C15A-Wire3, 1944 Willys MB, 1942 10cwt Canadian trailer |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Chorehorse question. | Jordan Baker | The Wireless Forum | 63 | 13-01-22 01:16 |
Chorehorse Generators | Neil Ashley | WW2 Military History & Equipment | 5 | 23-07-15 14:27 |
Chorehorse manual on e-bay | Tony Smith | For Sale Or Wanted | 3 | 06-05-07 12:55 |
Chorehorse funnel | chris vickery | For Sale Or Wanted | 4 | 28-02-06 20:57 |
Chorehorse generators | Colin R | The Softskin Forum | 9 | 18-12-05 22:56 |