MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #34  
Old 04-03-13, 09:11
Lew Skelton Lew Skelton is offline
Lew Skelton
 
Join Date: Mar 2008
Location: Feilding, New Zealand
Posts: 164
Default a little bit of work on the track's

had the carrier out of the garage this weekend, took both tracks off to remove links and improve track tension and remove the extra cleats that had been welded to some links to improve traction. Found a track link with a big crack and a pin that had broken off inside a link, fixed all that up as well as orientating all joiner pins so the heads are on the inside and split pins facing out for easy inspection, also replaced the dizzy cap and rotor arm, running much better. Also had a helper for all of 5 min....
Attached Images
File Type: jpg DSC00542.jpg (58.6 KB, 63 views)
File Type: jpg DSC00538.jpg (70.3 KB, 58 views)
File Type: jpg DSC00543.jpg (40.0 KB, 66 views)
File Type: jpg DSC00545.jpg (45.7 KB, 66 views)
File Type: jpg DSC00548.jpg (40.9 KB, 70 views)
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 02:17.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016