MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #24  
Old 17-03-11, 15:50
ajmac's Avatar
ajmac ajmac is offline
Alastair McMurray
 
Join Date: Sep 2006
Location: Lincoln, England
Posts: 434
Default

Great work on those fuel tanks, I wondered what baffles they had inside. I'm trying my hardest to get those exhaust parts done as soon as possible, from the conversation I had this moring they should be ready by the end of next week but I will not be able to confirm that until Monday 28th March as my Dad who is organising them is on Holiday in Norway! Apparently because the stub pipes are handed, the machinist put off making the jig until he had both types and the foundry were late sending the other type through to him.
__________________
Alastair
Lincoln, UK.


Under Restoration:
1944 No2 MK2 Loyd Carrier - Tracked Towing
1944 Ford WOT6 Lorry


The Loyd on Facebook

Last edited by ajmac; 17-03-11 at 15:55.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 03:10.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016