MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

Reply
 
Thread Tools Display Modes
  #1  
Old 12-05-10, 21:50
martyn martyn is offline
Registered User
 
Join Date: Feb 2009
Location: lincolnshire
Posts: 135
Default pattens

This is how far i got.....

Took a NEW OLD STOCK track link to a patten makers left it with him he said a price for a wooden master link £1000 this is 10% larger due to shrinkage , casting the link isnt the problem they would cast them by the tonn thats the easy part the hard part is machining the holes do you make a jig and drill one hole at a time 2 holes per link, or do you get a multi head drill and do 5-7-10? still need a jig making. the costs of setting up is going to be major unless someone wins the lotto and wants to invest its not cost efective. we were looking at£10 per link minium then the track pins on top of that 167 links per side........
as for the wheels i have two made from neopreen look good and are hard wearing just a thort instead of rubber?
Reply With Quote
  #2  
Old 13-05-10, 00:50
ajmac's Avatar
ajmac ajmac is offline
Alastair McMurray
 
Join Date: Sep 2006
Location: Lincoln, England
Posts: 435
Default

That's the figure I was coming up with..... trouble is in the end someone will have to bite the bullet. A friend back at home does have a full machine shop in his farm out buildings... he builds NEW 1930s race engines... for a price.
__________________
Alastair
Lincoln, UK.


Under Restoration:
1944 No2 MK2 Loyd Carrier - Tracked Towing
1944 Ford WOT6 Lorry


The Loyd on Facebook
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 04:50.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016