Default Bridge building times then and now.

The engineers in the latter part of WW2 were like a well oiled machine, and were renowned for their speed of construction as in Sapper's anecdote.

The film of "Bridge Too Far" shows what happens when the logistics train fails to place the bridging assets where they are needed: right behind the forward troops.

With the equipment in place on site, and reconnaissance and site preparation complete, bridge construction is then very rapid.

In the case of the 2 NZ Division, the engineer regiments were often recruited from the staff of the Public Works Department which had undertaken massive civil projects around New Zealand during the depression years. They built Dams, Power Stations, railway lines, extended the state highway network etc. This was part of a Government initiative to provide relief work for the thousands of unemployed. (Doesn't this sound like what's on the news today?)

After the war the CRE (Commander Royal Engineers) Bull Hanson became the PWD Commissioner of Works, and many sappers returned to the PWD and County Councils putting their skills to use on civil tasks.

The modern civil construction times allow for site selection, survey and preparation, transport of the bridge from a central depot probably hundreds of kilometres away, assembly of a construction team with experienced supervisors from where-ever, building the bridge, then constructing sealed approaches to withstand the size and volume of the modern vehicle fleet.

A week is an incredibly short time for this today!

Rob

Last edited by Rob Beale; 01-03-09 at 07:54. Reason: correct typos
Reply With Quote
  #2  
Old 01-03-09, 16:55
Barry Churcher's Avatar
Barry Churcher Barry Churcher is offline
Junior Member
 
Join Date: Feb 2003
Location: Castleton Ont.
Posts: 1,036
Default

I am sure when the bullets were flying the planning stages of the bridge erection took minutes. " We want to get from here to there, now"!
Today the Ministry of the Envoronment, the Conservation Authority, the local and State ot Provincial authorities and the local Indian band would all have to give approval. That could take years. Dirk keeps telling Janet about the Bailey Bridges for sale in Europe. She wants me to put one across our pond. Do any of you guys have a month off work to help me?
Cheers,
Barry
__________________

Every twenty minute job is one broken bolt away from a three day ordeal.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 02:25.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016