MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Softskin Forum

Notices

Reply
 
Thread Tools Display Modes
  #1  
Old 30-08-08, 21:23
ruumar ruumar is offline
Registered User
 
Join Date: Aug 2008
Location: Achthuizen Netherlands
Posts: 27
Default

I am almost finished, i only have to do the electric wirring.

I think the overloaded it once.

Because of the melting from some wirres.




What i am thinking about and maybey you guy's can advise me.

At the bottom of the control box is a air intake.



At the generator i have a conection that blows a lot of air, during operation.



I am thinking of conecting this to the bottem of the control box, so it gets verry good ventilated.

Bad or good idea ?
Reply With Quote
  #2  
Old 20-09-08, 08:48
ruumar ruumar is offline
Registered User
 
Join Date: Aug 2008
Location: Achthuizen Netherlands
Posts: 27
Default

Hi again.

Almost finished.

Can somebody advise me at the feeler gauges.

There talking about 018 but it's a englisch manual and there is no info on if it's in inches ore what so ever, what do i need, because the one i have are in mm.



Reegards

Ruud
Reply With Quote
  #3  
Old 20-09-08, 11:23
hrpearce's Avatar
hrpearce hrpearce is offline
WO8 C15A 142736
 
Join Date: May 2007
Location: Batlow Road near the Cow & Calf
Posts: 1,958
Default

Ruud the metric equivelet to 0.018" is 0.46 mm.
__________________
Robert Pearce.
Reply With Quote
  #4  
Old 20-09-08, 21:47
ruumar ruumar is offline
Registered User
 
Join Date: Aug 2008
Location: Achthuizen Netherlands
Posts: 27
Default

Thanx a lot.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 11:59.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016