MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Restoration Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 18-08-05, 03:11
Bob Carriere Bob Carriere is offline
Moderator
 
Join Date: Mar 2003
Location: Hammond, Ontario
Posts: 5,203
Default Progress...finally....

PROGRESS...... finally started re-assembly of the rear axle......

Doing the brake on the first side took me at elast 4 hours of assembly and re-assembly..... trying to sort out left side pieces form right side pieces.... then figuriongout the re-assembly sequence..... the other side.... took me less than an hour... of course I only had half the parts left.... and all for the same side.

Things like 1/4 inch U clips.... worth $2 each and not available for two weeks makes you go back to the parts box, spare axle etc. and clean up and straigthen a lot of small parts.

...but ain't she a beaut' new cylinders, new brake shoes and all painted in POR 15 Grey...... everything had been sandblasted even the nuts and bolts.


Picture is worth a 1000 words....
Attached Images
File Type: jpg im003024resized.jpg (116.4 KB, 317 views)
__________________
Bob Carriere....B.T.B
C15a Cab 11
Hammond, Ontario
Canada
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 18:47.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016