![]() |
|
#5
|
||||
|
||||
|
The track I bought was on rols of about 160 links, after I had loosen up the first 1.5 meters, I Could drive one wheel of the forklift on it and then I could rol it of with help of the forks, then lifting it up in the midle and then slamming with a big hammer for about 2 till 4 hours each track made it loose. I then mounted them on the carrier, and after about 6 miles I had to remove 2 links because the rust was coming out between the pins and the links.
Green greetings Hendrik
__________________
Ford F15A Chevrolet C60S-brkd-5 (4) Carrier MK 1 Willys MB Austin K2 ATV Welbike MK I Volvo L475 |
| Thread Tools | |
| Display Modes | |
|
|