![]() |
|
#1
|
||||
|
||||
![]()
Lynn
The concrete floor will get poured in the spring. I will be putting in floor heating as well. I’ve got all the tubes and styrofoam panels and rebar....lots and lots of rebar. Speaking of rebar I added “L” pieces that go from The foundation wall I to the floor every two feet. When the floor rebar goes in there will be a grid pattern spaced every two feet both lengthwise and widthwise. This should greatly help keep the floor together for a long time and also keep foundation wall from leaning or the floor heaving. However with the infloor heating frost should not be a concern.
__________________
Jordan Baker RHLI Museum, Otter LRC C15A-Wire3, 1944 Willys MB, 1942 10cwt Canadian trailer |
![]() |
Thread Tools | |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Ont Regt / Oshawa Museum New building | Robin Craig | The Sergeants' Mess | 5 | 09-01-18 03:35 |
Building the Alaska Highway!! | Garry Shipton (RIP) | WW2 Military History & Equipment | 47 | 24-12-11 08:20 |
Landy 2A W'Shop | Richard Coutts-Smith | For Sale Or Wanted | 2 | 05-03-08 10:04 |
Building bridges... | Snowtractor | The Sergeants' Mess | 0 | 23-06-06 17:42 |
Building Tankers in the Field | centurion | The Softskin Forum | 6 | 23-11-05 20:48 |