MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #31  
Old 24-01-16, 05:45
super dave super dave is offline
Dave Good
 
Join Date: Dec 2003
Location: Onoway, Alberta, Canada
Posts: 684
Default

Well I had a pretty good week overall and I got all of the conduit installed as well as the wiring. The rear engine compartment is now all wired and hooked up, Installed the rad and I was able to install the frame work around it as well as the rad side covers. This coming week I have some more fabrication to do as I have to make up some engine covers as well as a few more pieces.
Attached Images
File Type: jpg IMG_4727.jpg (69.3 KB, 40 views)
File Type: jpg IMG_4728.jpg (53.7 KB, 46 views)
File Type: jpg IMG_4729.jpg (51.5 KB, 47 views)
File Type: jpg IMG_4730.jpg (67.2 KB, 44 views)
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 15:57.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016