MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Softskin Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #24  
Old 12-04-15, 11:21
Ganmain Tony's Avatar
Ganmain Tony Ganmain Tony is offline
Registered User
 
Join Date: Jul 2009
Location: Ganmain NSW Australia
Posts: 1,242
Default Welding

Hole drilled in roof to attach overhead indicators, and wiring to them (small hole in the middle of the cab) and two to bolt the roof hatch shut.

Roof indicators fitted post war by the Australian Army I'm led to believe.

Brass block placed underneath each hole prior to welding. A lot less weld to grind off when doing this.

Removing Canvas window brackets reveal canvas webbing. Then canvas curtain clamped between first and second bracket.

Does anyone know what the rubber insulator looks like that stops the hatch bashing in the roof when it is opened?
Attached Images
File Type: jpg F15 8.jpg (47.3 KB, 8 views)
File Type: jpg F15 9.jpg (74.2 KB, 12 views)
File Type: jpg F15 17.jpg (44.5 KB, 7 views)
File Type: jpg F15 18.jpg (73.8 KB, 9 views)
File Type: jpg F15 16.jpg (43.9 KB, 7 views)
__________________
Pax Vobiscum.......may you eat three meals a day & have regular bowel movements.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 03:46.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016