MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 19-05-12, 17:46
Michael R. Michael R. is offline
Registered User
 
Join Date: Jun 2011
Location: Canada
Posts: 1,170
Default Last days: Installing track on the last Windsor

As the last Windsor was produced, 26 April, 1945, mounting track was still a three man operation(1945, not three person).

The accepted practice of positioning the track at 62-3/8" on centre, then rolling the carrier onto track until one foot extends behind center of the rear bogie is shown. Using a cable and track pin, two men to pull the track over the idler wheels and sprocket.

The Ford Service Bulletin describes the next step of the procedure:
"Operate carrier carefully in reverse gear with the brake locked on side opposite to track being installed." Or: "Start engine and operate slowly with transmission in reverse gear. This will tighten track and permit easy application of track jack." Clearly one needs to be on the correct page of the procedure.

Last edited by Michael R.; 24-06-12 at 18:27.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 02:35.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016