![]() |
|
#1
|
||||
|
||||
![]()
I think it should be metal to metal and the rubber grommet should be on the bottom closer to the bolt head.
__________________
Jordan Baker RHLI Museum, Otter LRC C15A-Wire3, 1944 Willys MB, 1942 10cwt Canadian trailer |
#2
|
|||
|
|||
![]()
Michaels middle picture would be correct.
__________________
Bluebell Carrier Armoured O.P. No1 Mk3 W. T84991 Carrier Bren No2.Mk.I. NewZealand Railways. NZR.6. Dodge WC55. 37mm Gun Motor Carriage M6 Jeep Mb #135668 So many questions.... |
#3
|
|||
|
|||
![]()
Thank you all that responded to my question. I got the mounts sorted out last night. It took a bit longer as I had thought. I had to open up the 5/8” dia hole the bolt required to the 1-1/4” hole the metal parts needed. Thanks again for the help.
|
![]() |
Thread Tools | |
Display Modes | |
|
|