![]() |
#12
|
|||
|
|||
![]()
i replaced quite a few patches on my T16 floor using normal mild steel plate and .8mm mig wire. i welded it normally in one run and had no problems.
the only time i got cracking of welds was doing short 1" welds on the 1/2" wading plates. it goes against what everyone else has said but i put it down to not enough heat transfer from the weld to the armour plate. i did a few large plate patches on the side armour with the mig turned up all the way and had no issues as i believe the original armour got hot and took longer to cool down helping to even things out.
__________________
_______________________ 1941 mk1 mortar Carrier 1941 Mk1* Carrier 1942 Mk1* Carrier 1943 T16 Carrier 1945 Mk3 Dingo 1941 Mk3 Covenanter 1941 Mk4 Churchill AVRE (now sold) 1944 Mk6 Cromwell (now sold) 1952 Mk3 Centurion 1952 ARV Centurion 1952 ARV Centurion 1953 Mk3 Centurion (breaking) |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Tailgate welding. | Jordan Baker | The Softskin Forum | 4 | 16-04-17 06:01 |
Carrier petrol tank floor cleats fixing ? | RichardT10829 | The Carrier Forum | 3 | 21-02-12 00:59 |
all about welding | Phil Waterman | The Restoration Forum | 16 | 30-04-11 00:57 |
WW2 welding trailers | Ryan | The Softskin Forum | 4 | 26-05-10 06:17 |
Welding/machining help please | Bruce Parker (RIP) | The Restoration Forum | 22 | 04-10-05 23:34 |