MLU FORUM  

Go Back   MLU FORUM > MILITARY VEHICLES > The Carrier Forum

Notices

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #6  
Old 28-09-11, 01:42
Lynn Eades Lynn Eades is offline
Bluebell
 
Join Date: May 2003
Location: Tauranga, New Zealand
Posts: 5,541
Default Kevin

you could work out the shim pack before you install the seal. I would set it up with a nice easy to turn feel, slightly on the preload side of zero preload (so that it cant move out of alignment under load) It should turn smoothly and easily. This will need to be done with the sector shaft (shaft and peg) lifted clear which will require removal of the box from the carrier.
Of course non of this is achieveable unless the components are in good condition.
There is probably a mark on the spline of the sector shaft that needs to be aligned with a mark on the vertical tube it fits into.
__________________
Bluebell

Carrier Armoured O.P. No1 Mk3 W. T84991
Carrier Bren No2.Mk.I. NewZealand Railways. NZR.6.
Dodge WC55. 37mm Gun Motor Carriage M6
Jeep Mb #135668
So many questions....
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT +2. The time now is 07:29.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright © Maple Leaf Up, 2003-2016