In some of the rougher containers over in Kandahar we had wood studs jammed floor to ceiling. Basically wedged in friction fit, then hung plywood. This was sometimes done for an easy to use man door as well. That way you didn't have to fight the main doors. But then in the desert we didn't have to worry about humidity. Because once you started drilling holes in a container it was no longer seaworthy and somebody in the Army got upset with you. So sometimes for mini-spit air conditioners we would run them through the plywood front wall too.

We usually had steel angle welded up into shelving units with heavy plywood. Worked fine for all the generator or vehicle parts. I have some where I'm at work now. I'll try to get some pictures shortly to show you.

At home I have two with the common walls cut out forming a larger temporary shop space. I just moved them from my old home to the new place and they aren't set up yet. I have to build a roof over the whole mess. No matter how hard I tried I couldn't get the seam between them to be water tight on the roof. I would have a pond and it would drip. I had begun welding steel studs to the interior, insulating and hanging plywood. Something I plan to finish up next month.

Matt