Got the welding done which required around 2# of wire and a bottle of gas. There were numerous unwanted holes, a few patches needed and a complete rebuild of the lip around the pto lever hole. A big shout out to oldlithgow for providing me with some scrap jeep body panels which included hat channel pieces that I needed. A friend of mine helped with the tin bashing and filler work which was a blessing knowing my lack of skill in that sort of thing.
2 of my pictures failed to load...any ideas?
__________________
Peter Phillips
1952 M38Cdn
1953 M100Cdn
1951 PE-95K Gen Set
MVPA
Cdn Forces 1986-2006
|