View Single Post
  #36  
Old 17-08-16, 10:10
jack neville jack neville is offline
Registered User
 
Join Date: Jun 2010
Location: leopold, victoria
Posts: 1,019
Default

The tops of the B pillars are modified to join the roof. Crush tubes are inserted in the pillar with small pieces of pipe and the trafficator opening was welded over and the pillar capped.
Attached Thumbnails
8C33A939-8CC8-41E9-82FD-7ED372B7EAB7.jpg   DBFB071F-1119-4CB4-B533-02031EEB09C3.jpg   2B396E42-2046-4305-9CB3-244407BD198E.jpg  
Reply With Quote