The bench is clear and it looks more like an engine
Generator, starter and water pump to be cleaned
I have been given a flywheel and a front pulley
That is about as far as I go until the piston is sorted and
all these parts go in the molasses for 6 to 8 weeks
I'll put the gearbox in too
After that I can do the spare parts into an engine
I have only 5 pistons/con-rods [30 thou and 4 rings cast iron] for it as well, as I posted one cylinder would have to be sleeved
At least most of the parts won't get lost
|