View Single Post
  #689  
Old 03-10-21, 23:04
David Dunlop David Dunlop is offline
Registered User
 
Join Date: Feb 2006
Location: Winnipeg, MB
Posts: 3,391
Default

Two weeks past cataract surgery on my right eye and so far so good. One good eye and one blurry eye definitely wreaks havoc on one’s ability to perform detail work, however. Even trying to read up on operating procedures has its challenges. Sigh! Two more weeks and the other eye should be done, so fingers crossed.

In the meantime, while looking for things I can actually accomplish, I stumbled across my old A and B Lists of things to find for the 52-Set Project. A surprisingly large number of things could be crossed off both lists now, which was encouraging.

Close to the top of the list overall now is the CURTAINS, Waterproof to install across the top front of the Carriers No.4. Be interesting to learn how these were originally packed from the factory; tagged and packed in sets in boxes, or individually rolled and wrapped in brown paper? Could have gone either way I suppose. Also be interesting to learn who made them.

David
Reply With Quote