Lynn

The concrete floor will get poured in the spring. I will be putting in floor heating as well. I’ve got all the tubes and styrofoam panels and rebar....lots and lots of rebar. Speaking of rebar I added “L” pieces that go from
The foundation wall I to the floor every two feet. When the floor rebar goes in there will be a grid pattern spaced every two feet both lengthwise and widthwise. This should greatly help keep the floor together for a long time and also keep foundation wall from leaning or the floor heaving. However with the infloor heating frost should not be a concern.