I did hire a company to do all the metal installation. My wife was adamant no one would be going up on the roof to install anything. The weather was also getting colder now and it was nice to watch from inside the metal going on. This past week the metal work was finished and the doors got installed. Just in time for winter weather to finally arrive. I still need to move a lot back inside for a storage tent I set up in the yard.
The shop is far from done as but I now have a sealed up shop.
Finally some reorganization and some vehicle stuff can happen again.
__________________
Jordan Baker
RHLI Museum,
Otter LRC
C15A-Wire3, 1944
Willys MB, 1942
10cwt Canadian trailer
|