Within two days the old shop was gone, the site cleared up and the foundation hole was dug. The weather was great with hole nice and dry, then the rain and rain and more rain came.
With some help I was shown how to frame footings and get them squared up. A couple guys from work were able to come by and help pour the concrete. We used a local supplier who provided their 50’ conveyor truck. This was a life saver a d was able to get the concrete right to where we needed it. After 40min the footings were poured.