I have been around this project for a number of years, and after reading through the posts, I feel more correct information needs to be put forward.

Estimates were submitted to the Regiment for preservation ($60K to $70K), this included crane, trucking, sandblasting, painting, wheel and track replacement as well as properly removing the interior to be stored for possible use for a future restoration of the tank.
The estimate for restoration to running (not including rebuilding the fighting compartment) was $120K to $130K. This would obviously include rebuilding the entire drive train as well as radiators and electrical system.

The project was quickly taken over by individuals who did not want to see this machine restored to running. Interviews were done throwing out ridiculous sums of money said to be needed for the project. All BS.

Fanshawe College, Militex, General Dynamics, Facca Fasteners, Fastenal, Roestenberg Welding, Xtreme Metal Worx, and Industrial Tire, Rho Can Machine, here in London, in the end supplied all paint, sandblasting, fasteners, steel, some fabricating/machining, perishable tooling, gases, welding consumables and abrasives, work space and some transportation.

Last edited by Perry Kitson; 13-10-23 at 23:23.