Thread: New view
View Single Post
  #37  
Old 08-05-10, 12:08
hrpearce's Avatar
hrpearce hrpearce is offline
WO8 C15A 142736
 
Join Date: May 2007
Location: Batlow Road near the Cow & Calf
Posts: 1,958
Default

I've made the three point linkage adaptor for the backhoe and the welding held for a test dig. Now I need to have the hydraulic bank serviced and then I can dig the 500 mm of surplus earth out of the top bay of the shed so the floor can be concreted, should be easier than pick and shovel and wheelbarrow. Once I've had a bit of practice I'll dig a service pit to make greasing the blitz easier .
Attached Thumbnails
P5080368 (Small).JPG   P5080365 (Small).JPG   P5080364 (Small).JPG  
__________________
Robert Pearce.
Reply With Quote