Crane costs were in excess of $45,000 for the lift out of and into the park, (resulting from the city's refusal to let the crane into the park) a lift from the street with a 400 ton crane was required.
A running battle with terminology on this project was an issue. The managers always called it a "restoration", when it was only a gut and preserve.
Last edited by Perry Kitson; 13-10-23 at 23:51.
|