View Single Post
  #13  
Old 10-02-08, 04:00
Bob Carriere Bob Carriere is offline
Moderator
 
Join Date: Mar 2003
Location: Hammond, Ontario
Posts: 5,259
Talking Finally did it.....

Geez Louise I finally managed to post 2 pictures at once....

Final picture is the back side after a quick coat of POR 15 Patching paste.... comes form a tooth paste like tube..... spreads easily with a putty knife..... make sur eyou clean you tools before it hardens.

Looks a little rough with the shinning light.... a coat or two of sandable primer and it will disappear.

The top side will need more careful manicuring to erase the joining lines. With everything welded from behind the top side is just puttied over.

We will wait to decide exactly where to cut the new 1 11/16 x 1 inch hole for the rod to connect between the handle and the bellcrank.

Will need to consult with Doctor Phil.....NO not the one on TV the one in Hew Hampshire....... I am having a hard time deciding where to mount the E Handle.....

On a more pleasant note.... weather was mild in the minus 3C and Lucifer kept us warm around 60 F inside the barn....

Boob
Attached Thumbnails
HPIM7875enlresized.jpg  
__________________
Bob Carriere....B.T.B
C15a Cab 11
Hammond, Ontario
Canada
Reply With Quote