Bush crane
In the process of dismantling a hybrid CCKW GMC/C60X blitz in the field there was a need to load the front axle on the trailer.
With the aid of a 200 litre drum , rear hub off the truck and a long piece of water pipe found nearby we achieved this goal .
Note that 2 studs are left in the hub to prevent the pipe from slipping off.
__________________
jim sewell
cmp and cckw
|