Thread: Vic rail 2225
View Single Post
  #98  
Old 07-06-13, 04:51
colin jones's Avatar
colin jones colin jones is offline
Registered User
 
Join Date: Jun 2007
Location: Adelaide
Posts: 1,810
Default

And the finished product. This is about a 3 hr job for me. After the slot has been welded and reshaped back,there is a taper on the top of the gear stick, then it must be machined down to thread cut dia and of course cut the 3/8/unf thread. The overall length is important as well.
Attached Thumbnails
VR2225 Engine 006.JPG   VR2225 Engine 007.JPG   VR2225 Engine 008.JPG   VR2225 Engine 009.JPG  
Reply With Quote