View Single Post
  #90  
Old 11-05-13, 11:14
Darrin Wright Darrin Wright is offline
Registered User
 
Join Date: May 2003
Location: Albury/Wodonga Victoria
Posts: 606
Default it came home last night

The blasting took about 8.5hr and it finally came home around 5.20pm.
The crane unlaoded it back onto the dollys and pallet jack.
The underside was undercoated as I cannot get to that part when it is down in position.
Then when ready, we pushed it back inside the workshop and covered it over until saturday morning for painting.
Attached Images
     
__________________
1943 Ford GPW Jeep "Follow Me"
1943 MBT trailer
1943 Dodge WC-57 Command Car
1943 Chev C60L Army Cargo Truck
1941 LP2 VR 731 Bren Gun Carrier 3" Mortar Carrying

Under restoration:
1940 LP1 Bren Gun Carrier
194? 1 Ton Trl Ben Hur
1942 C15A with sunshine cabin

MVPA 31338
Reply With Quote