managed to do a little bit more on the carrier last week. the under side is now de-rusted and painted and although it's no big achievement it's really nice to see a bit of green on it at long last. the 2 left hand suspension assemblies have been removed for blasting and painting, i was worried that i would be in for a fight trying to get them off but they slipped off as if they were fitted yesterday.
the axle will need to be stripped down and de-rusted for although it was a new assembly it wasn't filled with oil so there is surface corrosion from condensation but at least the pinion backlash will still be factory set so it's just a case of wire brush then fill with gear oil.
i had the controls professionally rebuilt and i'm pleased with the result, to be honest i doubt i could have set them up properly myself as the linkage is quite complicated and the tolerances don't allow for guestimating.
i hope to get it looking something like with the tracks on by the end of the month but then again i am a little over optimistic at times .