View Single Post
  #4  
Old 28-08-11, 01:37
rob love rob love is offline
carrier mech
 
Join Date: Feb 2003
Location: Shilo MB, the armpit of Canada
Posts: 7,594
Default

Bruce
From memory the sequence is: wood filler on bottom held in with 3 short bolts from bottom of box.

top metal 12 hole bracket held in place with qty 6 of 3/16 bolts (3 in front and 3 in rear). Another wood filler is bolted on top of that bracket with 3 more short bolts.
Reply With Quote