View Single Post
  #103  
Old 01-02-11, 10:36
RichardT10829's Avatar
RichardT10829 RichardT10829 is offline
Richard Harrison
 
Join Date: Nov 2008
Location: Cullercoats Newcastle Upon Tyne United Kingdom
Posts: 3,068
Default









please excuse my first crude attempt to see if the theory would work.... the idea is i will weld up the inside of my armour where the plates meet...the sections hidden by the angle bar.... then for the frame rails i will drill and plug weld the plates to the frame rails....the fake rivets with some locktite added will be wound on and should give the correct appearence. but majority of strength taken up by the welds... i have done a crude load test with the rivet under tension and i could hang a road wheel from it without it pulling.

i took a rivet out of the original armour and the closest coach bolt (18mm head) was the standard M6 i had tried the M8's but the head was slightly too big and the shank size did not leave enough material on the rivet to thread.

some will probably say LOTS OF WORK THAT ! and they would be correct but... using a pillar drill i drilled and tapped 3 rivets in 15 mins. on a lathe with a jig i can center the rivet easier and will be able to produce them much quicker.

for those who may not brave hot rivetting.....i tried and failed.... this may be an option

sorry if i have hijacked the thread Shaun...i suppose its kinda relevant to where you are with your build.
__________________
is mos redintegro

__5th Div___46th Div__
1942 Ford Universal Carrier No.3 MkI*
Lower Hull No. 10131
War Department CT54508 (SOLD)
1944 Ford Universal Carrier MkII* (under restoration).
1944 Morris C8 radio body (under restoration).

Last edited by RichardT10829; 02-02-11 at 23:24.
Reply With Quote